Soltherm external wall insulation installers in Ireland and the UK must document pre installation surveys, pull out test loads, adhesive contact area, mechanical fixing schedules, base coat mesh embedment, and topcoat batch records under NSAI Agrément 12/0371. CertFile and the installer build this compliance file together, capturing GPS photo evidence and generating audit ready warranty dossiers.

Certificate Holder

BOLIX SA

Zywiec, Poland

NSAI Certificate

Agrément 12/0371

Revised 10 Feb 2025
System Designer

Soltherm External Insulations Ltd

United Kingdom & Ireland

Approved Distributors

PW Thermal Building Solutions, Castleform, Bluebuild Energy, Greenspan System Sales, Hamkel Holdings, Red Letter Supplies

Stage by Stage Evidence Table for Soltherm ETICS

NSAI Agrément Certificate 12/0371 outlines stringent quality criteria across every installation milestone. Here is how CertFile and the contractor build verifiable proof for each phase.

StageWhat Certificate 12/0371 RequiresWhat CertFile Records with You
1. Pre Installation SurveyNSAI Agrément 12/0371 mandates a comprehensive pre installation assessment verifying substrate flatness, structural soundness, moisture levels, and damp proof course continuity.GPS tagged substrate overview photos, surface flatness measurement records, moisture readings, and documented substrate suitability sign off.
2. Substrate PreparationSurfaces must be thoroughly cleaned of all loose material, efflorescence, algae, and dust. Friable substrates require Soltherm primer treatment.Pre wash visual inspection photo, primer application batch number, ambient temperature reading, and surface dryness inspection log.
3. Adhesive ApplicationSoltherm SA or designated adhesive must cover a minimum of 40% surface area between the insulation board and the masonry wall using perimeter ribbon and dab pattern.Wet adhesive ribbon and dab pattern photograph, calculated contact area ratio, and product batch delivery docket upload.
4. Insulation Board StaggerSoltherm EPS, Plus EPS, or Mineral Wool insulation boards installed horizontally with staggered vertical joints in a brick bond pattern, interlocking at building corners.Wide elevation photos displaying staggered joints, corner interlocking layout, tight butt seam inspection, and absence of adhesive in gaps.
5. Mechanical FixingsInstallation of approved ETA mechanical fixings following project wind load specifications, anchored to specified embedment depths.Anchor pattern density photos per square metre, countersunk plug details, anchor embedment verification, and tensile pull out test records.
6. Base Coat & Mesh ReinforcementSoltherm base coat applied with alkaline resistant reinforcing mesh embedded in the outer third with 100mm overlaps and 45 degree corner butterfly stress patches.Wet on wet mesh embedment photo, 100mm lap inspection, window reveal stress patch verification, and wet film gauge thickness check.
7. Primer ApplicationSoltherm Color primer applied over cured base coat before decorative render application, observing required minimum drying intervals.Base coat cure duration log, primer surface coverage photo, primer batch code record, and ambient temperature confirmation.
8. Topcoat FinishApplication of Soltherm silicone, acrylic, or mineral finish restricted strictly to temperatures between 5°C and 25°C with continuous wet edge work.Finish bucket batch numbers, weather and relative humidity readings, scaffold elevation progress photo, and uniform texture check.
9. Completion & HandoverNSAI 12/0371 requires issuing a Certificate of Compliance with thermal bridging records and a homeowner manual with repair and maintenance instructions.Perimeter seal close up photos, cill flashing detail records, digital operative biometric sign off, and finalized technical compliance pack.

Soltherm Requirements Installers Often Miss

Derived directly from NSAI Agrément 12/0371 technical conditions, these specific requirements represent crucial documentation items during SEAI and building control audits:

1. Render Application Temperature Range

Certificate 12/0371 explicitly restricts render application to temperatures strictly between 5°C and 25°C. CertFile captures ambient temperature logs on site to verify conditions.

2. Certificate of Compliance with Thermal Bridging

A formal Certificate of Compliance incorporating thermal bridging Psi calculations must be issued on completion to satisfy Part L requirements.

3. Homeowner Repair and Maintenance Statement

The homeowner manual must contain an explicit repair and maintenance method statement explaining inspection cycles and approved cleaning methods.

4. Substrate Tensile Pull Out Records

When fixing into hollow blocks or aged masonry, mechanical anchor pull out resistance tests must be logged to prove characteristic loads satisfy wind specifications.

5. Fire Barrier Alignment

Continuous horizontal non combustible mineral wool fire barriers must be installed across floors where required by Technical Guidance Document B.

6. 45 Degree Corner Stress Patching

Diagonal reinforcing mesh stress patches must be installed at all window and door corners prior to main mesh embedment to prevent diagonal facade cracking.

10 Year Handover Pack

The Soltherm Homeowner Handover Pack

NSAI Agrément 12/0371 states that on completion of installation, building owners must be supplied with a Certificate of Compliance and a homeowner manual. This manual must contain maintenance schedules and repair instructions to safeguard system durability.

CertFile automatically generates this branded handover dossier, detailing topcoat reference codes, cleaning recommendations, annual inspection checklists, and official warranty sign off certificates.

What the Handover Pack Contains:

  • System specification overview and NSAI Agrément 12/0371 certificate copy.
  • Installed insulation thickness, board type, and calculated U value achieved.
  • Soltherm colour code and grain texture size for future facade matching.
  • Annual maintenance routine and guidance on non abrasive facade washing.
  • Installer warranty statement and contact information for ongoing support.

Frequently Asked Questions: Soltherm EWI Documentation

Join the Soltherm EWI Waitlist

Be the first to access automated Soltherm documentation workflows, stage photo checklists, and official warranty packs when they launch.

Join the waitlist